Interactive guide / Semantic explanation

What happens if one comes to my town?

Trace a proposed data center through construction, operations, electricity, water, jobs, taxes, public commitments, and unresolved local questions.

What this experience shows

  1. A project arrives

    The town changes before the building opens.

    Land, construction, roads, power, and water enter the conversation first.

    Physical focus: Your community

  2. After construction

    The activity changes shape.

    Construction work recedes. The permanent facility, infrastructure, taxes, and operating jobs remain.

    Physical focus: Data center

  3. Touch what changes

    Each object holds a public question.

    Power: who pays? Water: what source? Jobs: how many remain? Taxes: what incentives were granted?

    Physical focus: Your community

Evidence connected to this pathway

  1. local / Georgia

    Georgia's large-load rule permits longer contracts and minimum billing for new customers above 100 MW and requires regulator review of covered contracts.

    The design is meant to reduce the risk that infrastructure is built for a customer that later leaves or uses less power than forecast.

    Georgia Public Service Commission: Data Center Fact Sheet
  2. local / Virginia

    Virginia created a separate GS-5 class for qualifying large loads, with a 14-year service obligation and minimum monthly transmission and distribution charges set at 85% of contracted levels.

    Separate classification is intended to recover the distinct cost of serving hyperscale loads and reduce cost shifting.

    Virginia State Corporation Commission: SCC Data Center Initiatives — Dominion Energy Virginia

Continue through the evidence graph